Best practice

May 2018 – Water charges and GST

Posted on

This month, we helped a body corporate that came unstuck with GST after they took on the responsibility for charging lot owners for water usage.  The body corporate was registered for GST.  The reason for taking on the responsibility was so that a fairer allocation of the charges could be made to lot owners based on sub […]

Best practice

Improvements to common property in a town house scheme

Posted on

Recently, in a body corporate that we manage, a lot owner installed solar panels on the roof above his townhouse without approval.  Whilst he was totally unaware that permission was needed to make improvements to common property, it is not always easy to work out what is common property in a town house scheme. You must […]

Best practice

Counting of votes for special resolution

Posted on

We recently convened an AGM that highlighted the skill and knowledge needed to ensure the votes in a special resolution were correctly considered.  Some decorative lights at the entrance to the property had failed.  The repair cost was outrageous and the committee decided to disconnect and not reconnect them.  Approval was sought and given by the electrical designers […]

Best practice

Committee and owners meetings

Posted on

We helped a Body Corporate this month that had got a bit confused.  They were in the habit of holding a Committee and owners meeting.  At the meeting, there were lot owners present who were not on the Committee.  Their meetings were informal, and at past meetings there had been general consensus from all attending in relation to […]

Best practice

Lots in arrears for significant amounts of time

Posted on

There has been a lot of chatter about the recent District Court of Queensland decision (BC for Mount Saint John Industrial Park CTS v Superior Stairs & Joinery Pty Ltd [2017] QDC 245).  There is a clause (S145) in the Body Corporate standard module regulations that states – If the amount of a contribution or contribution […]

Body Corporate Manager

Exit fees charged by Body Corporate Managers

Posted on

This month we took on a new do-it-yourself client who had been using a Body Corporate Manager.  Their principal reason for moving away from the Body Corporate Manager was the significant exit fee stated in their proposed new contract.  The Committee would have happily signed the new contract provided the exit fee clause was struck out.  The Body […]

Body Corporate Manager

Tenant keys

Posted on

The rental agency of a lot in a Building Format scheme that we manage came to us requesting that we provision a key for the unit that they are managing as the tenant needed an additional key.  BCCM adjudications have been clear (http://www.austlii.edu.au/cgi-bin/viewdoc/au/cases/qld/QBCCMCmr/2000/71.html) that the body corporate is liable for the maintenance of locks and the […]

Issues

Why was this two lot Body Corporate created?

Posted on

We attended a seminar the other day where there was an in-depth discussion about survey plans and the way Body Corporate schemes come to be created. We came away with an understanding of why we often come across schemes with only two lots where it would been much simpler for the lot owners if the […]

Issues

Not Enough Committee Members

Posted on

As we were preparing AGM documentation for one of our Bodies Corporate, it became apparent the Body Corporate would not have the minimum of three committee members required under the Standard Module Regulation.  As the scheme had only five lots, we were able to recommend that they change regulation to the Small Schemes Module, under which […]

By-Laws

Egged

Posted on

Recently, a client in a building format plan found her townhouse egged.  Missiles had also been directed towards a neighbouring townhouse in the Body Corporate.  Her townhouse is surrounded by an exclusive use allocation, apart from an adjoining wall to another townhouse in the Body Corporate.  This messy event led the impacted lot owners and the Committee to […]